Commercial Rooftop
Logistics Park Rooftop Programme
Bucharest, Romania
38 MWp
Installed capacity
2023
Commissioned
47 GWh
Annual output
18 kt
CO₂ avoided / yr
EPC
Our scope
69,000
Modules / units
This multi-roof programme transformed the underused rooftops of a major logistics park into a 38 MWp distributed generation asset supplying tenants with on-site renewable power.
Programme approach
Electrix.solar engineered a repeatable rooftop system optimised for warehouse structures, rolling it out across twelve buildings with minimal disruption to ongoing operations.
Delivered
- Structural assessment and lightweight mounting design
- 38 MWp of rooftop PV across twelve roofs
- Behind-the-meter connection for tenant self-consumption
- Export metering and monitoring for surplus generation
Impact
Tenants now source a significant share of their electricity on-site, reducing energy costs and Scope 2 emissions while the asset owner benefits from a long-term, contracted power offtake.


Ready to build your next renewable project?
From feasibility to grid connection and lifetime operations — Electrix.solar is the EPC partner that delivers.